Styku captures a 360° digital model of your body in about 35 seconds — measuring circumferences, shape and composition indicators, so your progress is visible long before the weighing scale catches up.
Happy Clients
Diet & Wellness Experts
Styku is a non-invasive 3D optical body scanner. As you stand on a slowly rotating turntable, safe infrared structured light maps your body surface and builds a precise digital model in ~35 seconds — with no needles, no radiation, and zero physical contact.
Step onto the platform in form-fitting clothing. The turntable makes one slow rotation while the sensor captures your full body surface.
Sit down with a VeCura advisor and walk through your report — circumferences, body fat and lean mass indicators, waist-to-hip ratio and your 3D model.
Rescan through your programme. Each new scan overlays the last, so inch loss and shape change are shown side by side instead of guessed at.
Your advisor walks you through all four layers. Here is what each one means in plain language.
Watch the full scan cycle — stepping on, the 360° rotation, and the 3D model appearing on screen. No needles, no contact, no radiation.
About 35 seconds on the turntable while the sensor captures your full body surface.
Your advisor reviews the report with you on the spot, before you leave the clinic.
One scan replaces a tape measure, a mirror and a guess — with numbers that stay consistent every time you come back.
Two people can weigh exactly the same and look and feel completely different. What separates them is composition — how much of that weight is fat, how much is lean tissue, and where the fat sits.
This is also why the scale can stall while your body is still changing. If you lose fat and hold onto lean mass, the number barely moves — but your waist, hips and silhouette do. A Styku scan shows that change instead of hiding it.
Both still have a place. But neither can show you what a 3D scan shows you.
Nothing touches you, nothing enters you, and nothing is injected.
Uses safe infrared structured light — the same family of light as a TV remote sensor.
The sensor captures everything from a distance. No tape, no callipers, no handling.
Scans are done in a private scan room, and your report stays confidential to you and your advisor.
About 35 seconds on the platform, with your report ready to review straight after.
Anyone on a structured slimming or weight-loss programme who wants proof beyond the scale.
Track how targeted areas respond across a course of non-invasive contouring sessions.
Anyone following a diet or training plan who wants to know if lean mass is holding.
Anyone who simply wants a clear, repeatable record of their body as a starting reference.
A scan on its own is data. What makes it useful is the conversation that follows it. At VeCura, your scan is read alongside your goals, your history and your programme by an advisor who sees you at every stage.
Founded in 2020 by Dr. E. Carolin Praba Reddy, VeCura Wellness has grown to 38+ clinics across Tamil Nadu, Karnataka, Andhra Pradesh, Telangana and Pondicherry, with an in-house multidisciplinary team delivering non-invasive body contouring, slimming and weight management care.
Your scan is reviewed with a qualified wellness advisor, not handed over as a PDF.
Non-invasive body contouring and weight management plans built around your scan.
Rescan at whichever South India clinic is convenient, with transparent progress tracking at every review.
Styku is a non-invasive 3D optical body scanner. As you stand on a slowly rotating turntable, safe infrared structured light maps your body surface and builds a digital 3D model. From that model the software extracts circumference measurements, shape data and body composition indicators, which are then reviewed with you.
The scan itself takes roughly 35 seconds — one slow 360-degree rotation of the platform. Including changing and the report review with your advisor, allow around 15 to 20 minutes for the full appointment.
There is no ionising radiation involved. Styku uses infrared structured light — the same broad family of light used by a television remote sensor. There are no needles, no injections and no physical contact with the scanner. If you are pregnant or have a medical condition or implanted device, mention it at your consultation so we can advise you properly.
Form-fitting clothing gives the most reliable measurements — activewear, leggings and a fitted top, or base layers. Loose or bulky clothing adds volume the scanner will read as body shape. Please tie long hair up above the neckline, and remove bulky footwear. A private changing area is available at every clinic.
The main advantage is consistency. A tape measure depends on where it is placed and how tightly it is pulled, so readings drift between visits and between staff. An optical scan takes the same measurement the same way every time, which makes scan-to-scan comparison far more meaningful. Body composition figures are estimates derived from your 3D model and are intended for tracking trends over time, not as a diagnostic result.